Before & After

The proof is in the finish.

A selection of recent transformations — every surface here was restored on-site. No rip-outs, no replacements, no landfill.

AllBathroomKitchenTileVanity
Watch · On the job

See a resurface in progress

A short clip from a recent project — straight from our Facebook page.

Trouble viewing? Watch on Facebook.

Before and after: Cast Iron Tub RestorationBeforeAfter
Project · Bathroom

Cast Iron Tub Restoration

Heritage cottage · Northshore
Before
Deep rust staining, chipped enamel around the drain, and a yellowed base after 40+ years of daily use.
After
Glass-smooth gloss-white finish. New non-slip base. Cured and back in service within 24 hours.
Turnaround: 1 day on site
Before and after: 1970s Pink Tile RefreshBeforeAfter
Project · Tile

1970s Pink Tile Refresh

Rental refurb · Inner suburbs
Before
Cracked grout, dated pink tiles, a small area of missing tile near the floor.
After
Every wall recoated in high-gloss white. Grout re-sealed. Zero demolition or waste to landfill.
Turnaround: 2 days on site
Before and after: Laminate → Stone-look CountersBeforeAfter
Project · Kitchen

Laminate → Stone-look Counters

Family kitchen · Westside
Before
Worn beige laminate, burn marks near the cooktop, dated 90s finish.
After
Modern matte-black stone-look coating. Heat and stain resistant. Bench ready for use next morning.
Turnaround: 1 day on site
Before and after: Pedestal Basin RenewalBeforeAfter
Project · Vanity

Pedestal Basin Renewal

Character home · Bayside
Before
Rust-stained basin, faded enamel, mildew around the taps.
After
Full basin resurface, tap area re-sealed, warm white finish matching the existing tub.
Turnaround: Half day